333 Drakemire Drive, Glasgow, Scotland, G45 9SS

Office and Toilet Refurbishment, Ayr

Fit-Out Furniture

Client: South Ayrshire Council

Location: Ayr

value: £170,000


Strip out of existing open plan HR office, Male and Female chief executive toilets and installation of new windows.

HR Office – Installation of new flooring, new office loose furniture, glazed office screen, new doors, new tea prep area, new lighting, decoration throughout, construction of two bespoke seating pods. Design, including that of the seating pods, was provided by JC+P.

Toilets – Installation of new HPL cubicles, IVS panels, sanitary ware, sinks, lighting, vinyl flooring and decoration throughout.

Windows – Removal of old metal framed single glazed windows and replaced with new double glazed aluminium framed windows.

Key Features

  • Creation of bespoke seating pods (designed by JC+P) that due to the large size and top floor location had to be fully constructed onsite.
  • Installation of new windows on 3rd floor of building in a seaside location.
  • All works took place in Grade A listed building.

Related Case Studies

Refurbishment

George House Glasgow Boasts Bright, Modern Interiors

Glazed Partitions Refurbishment Suspended Ceiling

Modern Office Refurbishment for Gist Offices, Cumbernauld

Get in touch

Discuss Your Project

If you have a project in mind you would like to discuss with us, our expert team is always available to discuss it with you and book an appointment to chat in detail. Please dont hesitate to get in touch with us

Contact Us

Our Accreditations

Subscribe to our Newsletter

Subscribe to our monthly Newsletter to receive our latest News and Updates.

Sign up
Contact Us

Get a quote

We will be happy to assist you with any questions

333 Drakemire Drive, Glasgow, Scotland, G45 9SS

Name(Required)
Email(Required)